Drilling and surveying a 5 m-high section decides the success of marble extraction
Workers use a level to measure the incline of the raw stone and decide where to drill. The upper and lower holes must line up exactly so the cutting wire can pass through. Even a small error in surveying can force the entire high-value block to be scrapped, so the process demands precision.
The upper and lower holes must align exactly for the cutting wire to pass through. This process requires a high degree of precision in drilling a hole only about 2.5 cm wide. An error in surveying puts the entire expensive marble block at risk of being discarded.


